Sutter Metals Recycling
Sutter Metals, AustinCina Architects, and Merit Construction partnered on a team build project to construct a 29,600 SF Butler Manufactured Pre-Engineered Metal Building in Tacoma, WA. The scope of work involved extensive sitework including grading and demolition of existing concrete, stormwater systems, excavation and backfills, new concrete work pads, approaches and sidewalks. The new building consists of warehouse space on the main floor and a two-story wood-framed office with restrooms and a break room on the second floor. In addition, Merit was able to team up with subcontractors and implement the design-build process to develop a cost-effective solution for the fire sprinkler, plumbing, HVAC, electrical and fire alarm system for this project.