Josh Gobel from Thomas Architecture Studios (TAS) and Merit Construction teamed up to give a new look to Capital Christian Center church in East Olympia, WA. The tilt-up panel building was built in 1980 and originally housed the East Olympia Movie Theater situated off the busy intersection of Martin Way and College Street.
Read MoreLarson Automotive Group is on the move with updating their existing Porsche Dealership located at 1701 Alexander Avenue in Fife. There will be a 6,000 SF addition to their service shop to increase capacity for customer maintenance.
Read MoreMerit was selected by Kent School District as the General Contractor in the construction of a 3,800 square foot multipurpose room addition onto the existing Lake Youngs Elementary school gymnasium designed by Sierra-Martin Architects.
Read MoreMerit Construction is building a new “grand” entry and foyer for Capital Christian Center in Olympia, Washington. Work will include demolition of existing concrete tilt up walls so that a new glass entry atrium and glass sitting room can be the new focal point giving clear direction into the existing facility.
Read More