We are pleased to reveal the completion of our project at Port Townsend High School . The elevator and ADA upgrades included the addition of a 3-stop elevator at the front of the Main building along with a 2-stop elevator at the high school’s Annex Building. These additions allow students with limited mobility to access the third floor and provide easier access to the second floor.
Read More